The company „Tesla sistemi d.o.o.“ Belgrade presented the System for preventive fire detection to the management of the Hydroelectric Power Plant in Trebišnjica and Rudnik and the Termal Power Plant Gacko, Republika Srpska.
In Simens factory for the production of wind generators in Subotica, which is one of the most important domestic manufacturers of electrical machines that are applicable in the field of renewable energy, the company Tesla sistemi has installed a hydrogen detection system.
The building of the health clinic in Radenković is one of the facilities that are under protection and dates from 1926, and has not been in use for the last 15 years due to poor conditions.
Tesla sistemi company has been authorized to organize and conduct training for taking a special professional exam for the preparation of disaster risk assessment and protection and rescue plan. The authorization was issued by the Ministry of the Interior of the Republic of Serbia, Sector for Emergency Situations.